
SKY LEVEL 1
3-yr cash neededAED 983K

Palace-branded 4 to 6 bed waterfront villas at The Oasis from AED 13.13M
Status: Sold out according to portals; Emaar has not announced it
By Emaar Properties · Launched early 2025 (Emaar has not published a date) · Updated 16 Nov 2026
Palace Villas Ostra is a cluster of 526 Palace-branded standalone villas (4, 5 and 6 bedrooms) set on the canals and lagoon of Emaar's The Oasis in Dubailand. Launch prices started at AED 13.13M for a 4 bed, on an 80/20 plan with completion estimated for September 2029; portals now list it as sold out, so buying today means resale.
Our notes on each image, and what to ask the developer.

Palace Villas Ostra are Palace-branded villas, 526 of them in 4, 5 and 6 bed types. They use the same villa plans as Address Villas Tierra, so compare the two on plot position and branding, not layouts.
Image: Emaar Properties
A three-level villa with roof terrace and pool.
Image: Emaar Properties
The Contemporary style from the garden, with a long pool.
Image: Emaar Properties
The Chamfered style's angled upper floor, seen from the pool terrace.
Image: Emaar Properties
Living space opening fully to the pool and garden.
Image: Emaar Properties
An evening living area with a bar. Staging only; check the finishes schedule for what is included.
Image: Emaar Properties
Plot numbers, styles and types, with amenities A to O and the entrances marked.
Image: Emaar Properties
About 7,301 sq ft in total, the same plan as the Tierra 4 bed.
Image: Emaar Properties
About 8,048 sq ft in total. Ostra also offers 5 bed drop-type villas of about 11,000 sq ft.
Image: Emaar Properties
About 12,777 sq ft in total.
Image: Emaar Properties| Milestone | Approx. date | % | Amount |
|---|---|---|---|
| Down payment, on booking | month 0 | 10% | AED 1,313,000 |
| 1st instalment, June 2025 | month 2 | 10% | AED 1,313,000 |
| 2nd instalment, January 2026 | month 9 | 10% | AED 1,313,000 |
| 3rd instalment, July 2026 | month 15 | 10% | AED 1,313,000 |
| 4th instalment, April 2027 (20% construction) | month 24 | 10% | AED 1,313,000 |
| 5th instalment, December 2027 (40% construction) | month 32 | 10% | AED 1,313,000 |
| 6th instalment, May 2028 (60% construction) | month 37 | 10% | AED 1,313,000 |
| 7th instalment, December 2028 (80% construction) | month 44 | 10% | AED 1,313,000 |
| 8th instalment, September 2029 (100% construction) | month 53 | 20% | AED 2,626,000 |
Dates are estimated from the launch date and plan. The DLD fee (4%) is normally due at booking; admin and registration fees vary. Confirm all figures with the developer's SPA.
Sizes are Emaar's total areas, including terraces and carport. Prices are Emaar's launch prices; portals now list the cluster as resale only. Build progress of about 3% comes from a resale listing, not Emaar.


Build milestones and what you pay, in date order.
Construction dates come from the developer and press updates listed in the sources. Payment dates are estimated from the launch date and plan; your SPA has the exact schedule.
Rated from the brochure spec sheet, the contractor's record and how this developer's finished buildings have held up. A render can't show build quality, so ask to see a completed project by the same contractor.
Emaar is Dubai's largest listed developer and the master developer behind Downtown Dubai, Dubai Hills Estate and Arabian Ranches. Its H1 2026 results say it has delivered more than 130,900 homes since 2002, with about 51,400 under development in the UAE. Its finished communities generally resell well, though like most large developers it has seen some projects slip past their first quoted dates.
Delivered: Arabian Ranches (2004) · The Dubai Mall (2008) · Burj Khalifa (2010) · Dubai Hills Estate · Urbana, Emaar South (2020)
A higher score means less can go wrong between paying and getting your keys. It is a research tool, not financial advice.
It is an 80/20 plan: 10% on booking, then seven instalments of 10% between June 2025 and December 2028 (the last four tied to construction stages), with the final 20% due on completion, estimated September 2029.
Emaar's payment plan estimates construction completion in September 2029, so handover is expected around Q3 2029. Some portals say Q4 2029, and Emaar may revise it.
Launch prices started at AED 13.13M for a 4 bed, AED 14.56M for a 5 bed and AED 24.05M for a 6 bed. Portals list the cluster as sold out, so you now buy on resale; check recent registered sales rather than asking prices.
It sits inside Emaar's The Oasis in Dubailand, with entrances off Al Yalayis Street. Emaar puts Al Maktoum International Airport about 18 minutes away and Dubai Hills Mall about 20 minutes.
There are 4, 5 and 6 bed standalone villas in Classic, Contemporary and Chamfered styles. Total areas run from about 7,269 sq ft for a 4 bed to 12,959 sq ft for a 6 bed. The 4 bed has a basement but no roof floor, the plain 5 bed has no basement, and the 5 bed with basement, 5 bed drop type and 6 bed are the larger options.
Register for Palace Villas Ostra at The Oasis and we'll send the full brochure, current price list and available units.

3-yr cash neededAED 983K
Golden Visa eligible3-yr cash neededAED 18.82M
Golden Visa eligible3-yr cash neededAED 1.45M