Golden Visa eligibleLyra at Ghaf Woods
3-yr cash neededAED 536K

Nakheel Palm Springs first release: 3 to 5 bed townhouses and villas from AED 3.8m
By Nakheel · Launched 10 Nov 2026 · Updated 16 Nov 2026
Palm Springs is Nakheel's 3.8 million sq m community beside Palm Jebel Ali, and first release offers 3 and 4 bed Aliso townhouses from AED 3.8 million and 4 and 5 bed Rancho villas from AED 7.0 million. Nakheel is taking paid EOIs of AED 100,000 on a 60/40 plan, with construction due to finish in October 2030.
Our notes on each image, and what to ask the developer.

This is the park every neighbourhood in this first release is planned around. On the masterplan Rancho One and Two back straight onto it, so ask which plots face the park and which face the internal roads.
Image: Nakheel
You can see how big the scheme is and that the apartment blocks wrap the edges along the main roads. Palm Jebel Ali and the port sit behind it, so you're inland, not on the beach.
Image: Nakheel
These are the 4 and 5 bed Rancho villas, three storeys with a lot of glazing at the front. The plots are fairly tight for the price, so look at the side gaps between houses.
Image: Nakheel
The townhouse streets look pedestrian-friendly with a footpath and lawn. End units sit on bigger corner plots, which is worth paying a bit more for.
Image: Nakheel
Floor-to-ceiling glass to the garden is the selling point here. The furniture and pool are staging, so ask for the actual specification sheet before booking.
Image: Nakheel
The villas (green) sit between Canyon Park and the townhouses (orange), and the townhouses back onto the southern road edge. If road noise matters, ask for plots on the park side of Aliso.
Image: Nakheel
The plot sits right on Sheikh Zayed Road with a metro station marked next to it, which is good for access. Nakheel quotes 14 minutes to Palm Jebel Ali and 23 to DWC.
Image: Nakheel
Two floors with a maid's room, powder room and two-car carport, and all three bedrooms upstairs. The plot is narrow, so the garden is a strip at the back.
Image: Nakheel
There's a ground-floor guest bedroom, four bedrooms over two upper floors and a top-floor terrace. The pool drawn at the back is not included in the price.
Image: Nakheel| Milestone | Approx. date | % | Amount |
|---|---|---|---|
| Down payment on booking | month 0 | 10% | AED 380,000 |
| 1st instalment (April 2027) | month 5 | 10% | AED 380,000 |
| 2nd instalment (September 2027) | month 10 | 10% | AED 380,000 |
| 3rd instalment (February 2028) | month 15 | 10% | AED 380,000 |
| 4th instalment (July 2028) | month 20 | 10% | AED 380,000 |
| 5th instalment (December 2028) | month 25 | 5% | AED 190,000 |
| 6th instalment (May 2029) | month 30 | 5% | AED 190,000 |
| 7th instalment on handover (October 2030) | month 47 | 40% | AED 1,520,000 |
Dates are estimated from the launch date and plan. The DLD fee (4%) is normally due at booking; admin and registration fees vary. Confirm all figures with the developer's SPA.



Build milestones and what you pay, in date order.
Construction dates come from the developer and press updates listed in the sources. Payment dates are estimated from the launch date and plan; your SPA has the exact schedule.
Rated from the brochure spec sheet, the contractor's record and how this developer's finished buildings have held up. A render can't show how well a building is finished, so ask to see a completed project by the same contractor.
Nakheel is Dubai's best-known master developer, behind Palm Jumeirah, The World and Dubai Islands, and since 2024 it sits inside Dubai Holding. Its record is mixed: it went through a large debt restructuring in 2009 to 2011 and Palm Jebel Ali sat stalled for years, though construction across Dubai Islands and Palm Jebel Ali is now visibly under way.
Track record: Palm Jumeirah (first handovers 2006) · Jebel Ali Village, 892 homes (handover began 2026) · Bay Grove Residences, Dubai Islands (1,154 homes under construction, contracts awarded 2025 and Oct 2026)
Developer backing: Government-owned Nakheel has been part of Dubai Holding, the Dubai government's holding company, since the Ruler of Dubai ordered its incorporation in March 2024; the Dubai government had taken it over from Dubai World in 2011 (WAM and The National, 2024). Nakheel history →
A higher score means less can go wrong between paying and getting your keys. It is a research tool, not financial advice.
It sits on the mainland in Jebel Ali, between Sheikh Zayed Road and Palm Jebel Ali, next to a metro station on Nakheel's map. Nakheel quotes about 14 minutes to Palm Jebel Ali, 23 minutes to Al Maktoum International Airport and 25 minutes to Palm Jumeirah.
AED 3.8 million for a 3 bed townhouse. Nakheel's sheet lists 4 bed townhouses from AED 4.6 million (G+1) and AED 5.2 million (G+2), 4 bed villas from AED 7.0 million and 5 bed villas from AED 8.9 million.
60/40. You pay 10% on booking, 50% in six instalments between April 2027 and May 2029, and 40% on handover in October 2030.
Nakheel estimates construction completion in October 2030, which is when the final 40% falls due. No contractor has been named yet, so treat that date as a target.
Through Nakheel's paid EOI, which needs AED 100,000 and your passport details. The EOI is not a sale: Nakheel sends a booking form when units are released, and the terms say the project is still being registered with the Dubai authorities.
Register for Palm Springs and we'll send the full brochure, current price list and available units.
Golden Visa eligible3-yr cash neededAED 536K
Golden Visa eligible3-yr cash neededAED 10.598M
Golden Visa eligible3-yr cash neededAED 1.253M
Leave your WhatsApp number and we'll send prices, floor plans and what's still available.
Get the price list