Golden Visa eligibleLyra at Ghaf Woods
3-yr cash neededAED 536K

63 Rosewood-branded beachfront homes on Dubai Peninsula, from about AED 18.9M
Status: The map pin is approximate: it comes from the marketing microsite and H&H has not published a verified site location
By H&H Development · Launched 10 Nov 2026 · Updated 16 Nov 2026
Rosewood Residences Dubai is a 32-floor tower of 63 Rosewood-serviced homes by H&H on Dubai Peninsula, the new waterfront masterplan off Jumeirah beside the Four Seasons Resort. H&H formally launched sales in November 2026 (portal records show sales from July 2026) at an average of AED 10,000 per sq ft, with two-beds listed from about AED 18.9M and completion due at the end of 2029.
Our notes on each image, and what to ask the developer.

A slim tower with deep terraces set behind the beach and the low Rosewood villas. Only 63 homes over 32 floors, so most residences get two or more aspects; ask which side faces the sea and which faces the city.
Image: H&H
This is the beach edge of the peninsula with cabanas and planted steps. It shows what direct beach access means here, but check which parts of the beach are for residents and which are shared with hotel guests.
Image: H&H
This may show one of the Rosewood villas; H&H has not said which building this terrace belongs to. It is a good guide to the finish level, but no apartment gets a garden pool like this.
Image: H&H
Warm stone and timber in the Banda style, with Burj Khalifa in the window. The city-facing homes get this view; the sea-facing ones look the other way, so choose your orientation before your floor.
Image: H&H
The crescent beach runs along the eastern edge and the superyacht marina sits on the opposite, western waterfront. Rosewood sits on the beachfront; the rest is still a building site until around 2029, so expect works around you if other phases run late.
Image: H&H
The peninsula is off Jumeirah Street beside the Four Seasons, with City Walk, DIFC and Downtown a short drive inland. Access is through one road off Jumeirah Street, so ask how traffic in and out will be managed.
Image: H&H| Milestone | Approx. date | % | Amount |
|---|---|---|---|
| During construction (schedule not published) | month 18 | 50% | AED 9,450,000 |
| On completion (end 2029) | month 37 | 50% | AED 9,450,000 |
Dates are estimated from the launch date and plan. The DLD fee (4%) is normally due at booking; admin and registration fees vary. Confirm all figures with the developer's SPA.




Build milestones and what you pay, in date order.
Construction dates come from the developer and press updates listed in the sources. Payment dates are estimated from the launch date and plan; your SPA has the exact schedule.
Rated from the brochure spec sheet, the contractor's record and how this developer's finished buildings have held up. A render can't show how well a building is finished, so ask to see a completed project by the same contractor.
H&H was set up in 2007 by Shahab Lutfi and Mohamed Al Hussaini and works as developer, asset manager and property manager, often alongside its sister investor Bright Start; it is best known for hotel-led schemes with Four Seasons, Aman, Janu, Baccarat and now Rosewood, plus its own Eden House apartment brand. Its recent record includes Eden House The Canal sold out and handed over in December 2025 and the 93-storey City Tower completed in 2026, but it does not publish total units delivered or on-time statistics, so the delivery record is judged project by project.
Notable projects: Four Seasons Resort Dubai at Jumeirah Beach (opened 2014) · Four Seasons Hotel DIFC (opened 2016) · Eden House Al Satwa (2021) · Eden House The Canal, Dubai Water Canal, 98 homes (handed over Dec 2025) · City Tower, Sheikh Zayed Road, 695 homes, 365 m (completed 2026)
Developer backing: Private Privately held by its founders, with Shahab Lutfi as chairman; its Eden House Al Maryah project is a partnership with Mubadala, but no government shareholding in H&H itself is reported (H&H website; Mubadala, 2026). H&H Development history →
A higher score means less can go wrong between paying and getting your keys. It is a research tool, not financial advice.
Two-bedroom homes start from about AED 18.9M and three-beds from about AED 29.8M on the current price list, and H&H puts the average at AED 10,000 per sq ft. The duplexes run from AED 65M, the single five-bed is AED 144.1M and the penthouse AED 483.8M, so get the live list before you plan around these.
On Dubai Peninsula, the new H&H waterfront masterplan off Jumeirah next to the Four Seasons Resort at Jumeirah Beach. The marketing microsite puts Downtown about 6 km away, DIFC about 7 km and Burj Al Arab about 10 km.
H&H Development, the Dubai developer behind the Four Seasons hotels in Jumeirah and DIFC, Eden House and City Tower. The land is owned by Bright Start, a real estate investment company and the homes will be serviced by Rosewood Hotels & Resorts.
The plan being marketed is 50/50: half during construction and half on completion, plus the 4% DLD fee at SPA. A portal shows a 10/40/50 version, so ask H&H for the written schedule.
Completion is expected at the end of 2029, in line with Rosewood's 2029 opening date for the hotel. In November 2026 the plot was still at ground improvement, 50% done, so watch for the main contractor award in 2027.
Register for Rosewood Residences Dubai and we'll send the full brochure, current price list and available units.
Golden Visa eligible3-yr cash neededAED 536K
Golden Visa eligible3-yr cash neededAED 10.598M
Golden Visa eligible3-yr cash neededAED 1.253M
Leave your WhatsApp number and we'll send prices, floor plans and what's still available.
Get the price list